10-4-06

Dave taught me how to take apart the machines and take all the tubes to the dump

10-6-06 Dave and I cut hoses to set up the machines
10-9-06

I took out, cleaned, and replaced bearings in the back checks

10-11-06

Replaced the back checks

10-13-06

Replaced back checks

10-15-06 Cleaned and replaced orfices in the Hose Nipples
10-17-06 Checked all nipple parts for rust or corrosion
11/1/06 Replaced back checks
11-3-06 Replaced back checks
11-5-06 Replaced orfices
11-6-06 Removed Hose From Machines
11-8-06 Removed Hose From Machines
11-10-06 ISS
11-13-06  
11-15-06 No School
11-17-06 No School
11-20-06 Back checks
11-27-06 Back Checks
11-29-06 Inserted more orfices in the nipples
12-4-06 Checked Air Pressure In tires and filled them full
12-6-06 Bent Metal for hose, and cut hoses
12-8-06 Loosen back checks for replaceing
12-11-06 Replaced the back checks, Used torch to warm tubes and place back checks